The context
In the Ratoma district, a building being fitted out needed air conditioning, including a large hall under a steel roof structure. The goal: even comfort across the whole space, with discreet units built into the ceiling rather than fixed to the walls.
4-way cassette units were chosen: recessed into the suspended ceiling, they spread air in every direction and leave the walls completely free.
What we did
Master craftsman Mamadi Traoré and his team ran the job in three stages, in step with the other trades on site:
- Before the ceiling was closed: positioning and hanging each cassette on the metal framework, running the refrigerant lines, condensate drainage and power supply.
- While the suspended ceiling was installed: coordination with the board installers to leave openings perfectly aligned with each unit.
- At the finishing stage: fitting the front panels flush with the ceiling, protecting the units during painting and checking the whole installation.
The result
Aligned, flush-mounted cassettes, perfectly integrated into the finished ceiling. Air is spread evenly across the large hall, the walls stay free and the result is clean, with no visible ducts or cables.
A job that shows what we expect from our tradespeople: method, careful finishing and good teamwork with the other crews on site.











